• Monday - Saturday 09:00 to 6:00
  • +91-9915764009
  • sales@climategrip.com
  • Home
  • Who we are
  • products
    Air handling unit (ahus) air washer exhaust air unit aluminium damper ceiling suspended units fan coil unit (fcu) floor mounted air washer unit hepa set powder coated modular ot
  • Services
    Hepa Terminal Filter Testing Non Viable Particle Count Test Standard And Regulation Air Velocity Test Airflow Direction Test hvac / clean room validation
  • accessories
  • blog
  • contact us
Best Practices for Energy Efficiency in AHU

Best Practices for Energy Efficiency in AHU

Climate Grip's Team April 18, 2024

As the world continues to prioritize sustainability and energy conservation, industries are increasingly turning to

Read More »
Replace Filters in Your Air Handling Unit (Useful Tips)

Replace Filters in Your Air Handling Unit (Useful Tips)

Climate Grip's Team April 11, 2024

Maintaining a healthy indoor environment requires regular HVAC system upkeep, including crucial air filter replacement

Read More »
Things to Consider When Upgrading Your Exhaust Air Unit

Things to Consider When Upgrading Your Exhaust Air Unit

Climate Grip's Team March 29, 2024

Upgrading your Exhaust Air Unit (EAU) is essential for better indoor air quality, energy efficiency,

Read More »
9 Tips to Save Money on HVAC Filters

9 Tips to Save Money on HVAC Filters

Climate Grip's Team March 21, 2024

Maintaining a healthy and efficient HVAC system is crucial for indoor air quality and cost

Read More »
A Complete Guide on AHU Dehumidifiers

A Complete Guide on AHU Dehumidifiers

Climate Grip's Team March 15, 2024

In the realm of HVAC systems, ensuring optimal air quality isn’t just a luxury but

Read More »
AHU for Ointment Manufacturing Plant for Cosmetic Applications

AHU for Ointment Manufacturing Plant for Cosmetic Applications

Climate Grip's Team March 12, 2024

In the dynamic world of cosmetic manufacturing, ensuring the highest quality standards is paramount. From

Read More »
« Previous Page1 Page2 Page3 Page4 Page5 Next »

Our Products

  • Air handling unit (ahus)
  • air washer
  • exhaust air unit
  • aluminium damper
  • ceiling suspended units
  • fan coil unit (FCU)
  • floor mounted air washer unit
  • hepa set powder coated
  • modular ot

Our Services

  • Hepa Terminal Filter Testing
  • Non Viable Particle Count Test
  • Standard And Regulation
  • Air Velocity Test
  • Airflow Direction Test

Useful Links

  • Who We Are
  • Accessories
  • Products
  • Contact Us

Punjab

Head Office & Mfg. Unit I: Plot No. 162, Hansa Industrial Park, Barwala Road, Derabassi
Pincode- 140 507 (Punjab)

Maharashtra

Corp. Office: Plot No. 606, 6th Floor, Oracle Business Hub, Near Ashar IT Park, Road No. 16/Z, Wagle Industrial Estate, Thane. Pincode-400604 (Maharashtra)
Mfg. Unit II: Mahavir Logiplex, A1, Unit No 1 Near Sawad Naka, Kalyan Padgha Road, Aamne Village, Bhiwandi, Thane, Maharashtra - 421302 (India)

Call us

+91 9915764009
+91 9876662465
+91 9915932009

Mail us

sales@climategrip.com
info@climategrip.com
salesmumbai@climategrip.com

© Climate Grip — Designed by Teejaysoft